Stunning design with cedar cladding

Designed bespoke for Goat Lees to match the striking design of the main school building

Modular school building in just a few weeks

Beautiful contemporary building - a stunning classroom perfect for performances and music lessons

Early access with double doors to the rear

Large 7m wide doors which open up onto the playground

Light and airy classroom

Ample storage space

As this modular building is used for performances and music lessons, plenty of storage space has been created.

A dedicated learning space for music and performances

Installed just in time for the new academic year

Music Classroom And Performance Pavilion, Ashford

BACKGROUND

With 70 pupils taking music lessons and no available classroom, Goat Lees Primary School needed a new modular music room for music lessons and performing arts. They chose Green Modular due to the bespoke innovative design, as the main school building had previously won awards for its architectural design. Another consideration in choosing Green Modular was the need for the new facility to be ready for operational use by the new school year in September.

Key features

A challenge of this installation was the sloping site, which needed to be dug out to drop the building down into the ground. The overall height of the building is reduced, meaning it blends into the surrounding environment. There are two entrances for easy access – double doors at the back with step-free wheelchair access and folding doors at the front to open up the room for outdoor performances.

The building has an unusual specification in that there needed to be lots of storage space to store equipment and musical instruments. As the music building will be used often as a performance space, the main 7m wide doors can be folded back to one side, giving great access to the adjoining playground where the audience can be seated for performances. The school will also be having decking installed in front of the main doors, so that it can be used as a stage.

Green Modular installed the main structure of the building in just three weeks, and with further finishing work carried out over the school summer recess the facility was ready for use at the beginning of the new school year.

Specifications

  • Durable, easy clean, commercial grade vinyl floor and barrier mat
  • Impact resistant plasterboard walls
  • Laminated toughened safety glass for highest safety and durability
  • Coordination of the school’s alarm, door access and data contractors for integration with school systems

If you’re impressed by our modular music room and would like to discuss your own needs for a modular building, please call us on 01582 805710.

Are you considering a modular classroom for your school? Download our helpful whitepaper on mobile classrooms.