Case Studies

Filter Icon Building Type
Filter Toggle Icon
Filter Icon Category
Filter Toggle Icon
Filter Icon Room Type
Filter Toggle Icon
Filter Icon Classroom Capacity
Filter Toggle Icon
Filter Icon Classroom Size
Filter Toggle Icon
Filter Icon Site Location
Filter Toggle Icon
Filter Icon Features
Filter Toggle Icon

Reception Classroom, St Cross Primary

St Cross Primary School wanted a new, purpose-built outdoor classroom for their Reception class. Find out how Green Modular worked to create a colourful and distinctive school building to facilitate outdoor play.

St Cross Catholic Primary School 0884

Extra Classroom, Mulbarton

Green Modular built an extra classroom for Mulbarton School when their pupil intake increased. Find out how the new modular school building met the school’s needs for space and fitted in with the school’s rural setting.

IPP 180925025

Re-Locatable Group Room, Bedfordshire

Broadmead Lower School needed a new, movable classroom that could be relocated if necessary in the future. Find out how Green Modular rose to the challenge.

IPP 170712015 1 e1502118495447

15 Child Pre-School Classroom, Bedfordshire

“I’m very pleased with the finished structure, it's been much admired by others too. thanks to both you and your team for such a lovely addition to our school." Jane Trott, Headteacher.

Roxton 1170x520

Reception Classroom, Norfolk

“I was really impressed with the ease of working with Green Modular. Nothing was too much trouble; for every barrier that we thought of, they thought of solutions to those problems.” Jo Johnson, Head Teacher

Worstead primary school 1

Music Classroom And Performance Pavilion, Ashford

“We are very pleased with our new music facilities and the involvement in the design process has been great. The modular music building looks amazing and was installed very quickly.” Teresa Adams, Headteacher, Goat Lees Primary School.

Goat Lees IPP 160914001

Security Gatehouse Building, Alconbury

“We choose Green Modular because they’re experts in design, who provided us with a custom made building that matched the existing Gatehouse in design and colour. We would recommend them to anyone planning a similar project”. Tom Baker, Project Surveyor

Blvd C Image 1 from Client Gate House Blog resized

Family Worker Room, Greenwich

“We’d like to pass on a huge thank you to the fantastic workforce who did a wonderful job. Everyone was very sensitive to the needs of the children and “The Pod” as it’s affectionately known is loved by everyone” Jan Andrews

IMG 1089 STUDIO HAMIO SCHOOL NORTH LONDON NP Hi Res Craig took rotated RESIZED BLOG

Nursery Building Inside A Building

“Green Modular understood what this project would mean to the community. The workforce were very professional and responded quickly to all requests. I would definitely recommend Green Modular for any enterprise where children’s welfare is paramount.” Mauranne Newby, Premises Manager

Fawood Stills 59 outdoor classroom home page 10

School Meeting Room, Rowan Hill

“Not only can we use our modular school building room as an additional outdoor school classroom, it’s a great area to have meetings with the teachers, and parents. We are all delighted with our new space.” Mrs Kathy Kershaw, Cert. Ed. Headteacher

OUTDOOR CLASSROOM ROWAN SCHOOL ESHER CIMG4423

The Wilderness Nursery

Church Cowley St James’ school needed a new nursery building, and they knew they wanted something bespoke and visually striking. It had to be airy and attractive, and it had to fit with the forest school ethos that the nursery was pursuing. It also had to be built quickly. The result is Green Modular’s most challenging building to date, a distinctive contemporary pre-school fit for the future.

IMG 2335